Our wind turbine assembly activities start unloading main components at the harbor
- * loading and unloading works during the transportation of these materials
- *Continue preparation of main components and assemble at the site,
- * hand over wtg to client and share all SIF-Punch and Recording of main componenet list.
- *Send back all tool and liftings with performing inventory
- *Send back all returnable frames.